Welcome
Welcome to our blog. For more information about the work of University Church of St Mary the Virgin, including services, events and activities, please visit our website: www.university-church.ox.ac.uk/
Tuesday, 10 April 2012
Monday, 5 March 2012
Reaching New Heights
On March 1st Vicar Brian Mountford, Education Officer Lucinda Williams and Project Coordinator Sophie Slade braved the dizzy heights of the scaffolding to be rewarded with what can only be described as the most spectacular views of Oxford.
The ascent, which took the team to the pinnacle of 27 scaffolding platforms, was led by project architect Oliver Caroe and several sturdy footed members of the construction team whose reassuring words were very much appreciated by all!!
The ascent, which took the team to the pinnacle of 27 scaffolding platforms, was led by project architect Oliver Caroe and several sturdy footed members of the construction team whose reassuring words were very much appreciated by all!!
Monday, 27 February 2012
February 2012 - Project Update
Since the contractor took over the North-East corner of the church a comprehensive programme of protection works have taken place to ensure that areas within the site are protected from damage during the course of the works. Meanwhile, the scaffolding was completed on the tower and stonework cleaning and repair commenced. We have been rather lucky and have only lost one day to date on the stonework due to cold weather.
On the 15th of February all the bells were successfully removed from the tower and taken to Whites’ workshop where some of the fittings will be repaired. Conservation work in the Chancel, De Brome Chapel and other areas is due to start within the next few weeks.
On the 15th of February all the bells were successfully removed from the tower and taken to Whites’ workshop where some of the fittings will be repaired. Conservation work in the Chancel, De Brome Chapel and other areas is due to start within the next few weeks.
Sophie Slade, Project Coordinator
Saturday, 4 February 2012
January in Pictures - Part II
Week 3 – Not for the faint hearted
With the scaffolding around the main body of the Tower now complete, the team begin the heady job of extending the framework up the spire.


Week 4 – That’s a lot of bubble wrap!
The historic stone pillars are one of the many structures in the church to be protected from damage during the works with layers of bubble wrap.




All photographs (c) 2012, Natalie Nolan, David Goodwin, Richard Taylor
Coming up in February.......
- The Adam de Brome gains a storey
- The bells are removed from the Tower for conservation
- We meet the people behind the hard hats
Lucinda Williams, Heritage Education & Volunteers Officer
Monday, 16 January 2012
January In Pictures
With our photography team now firmly established we can begin our new feature. Each month we will bring you an update on the works as they happen, through the eyes of our photographers.
Week 1 - The big spring clean.
The beginning of the year saw staff members, parishioners and clergy rallying together to clear the church ready to hand over the North East corner to the contractors in the second week.
Week 2 – No going back
The wait is finally over as the contractors move in and begin to erect the protective screens between the De Brome Chapel, the Chancel and the Nave.

Coming up in week 3......The tower and spire disappear beneath the scaffolding!
Photographs 1-5 (c) David Goodwin
Photograph 6 (c) Richard Taylor
Week 1 - The big spring clean.
The beginning of the year saw staff members, parishioners and clergy rallying together to clear the church ready to hand over the North East corner to the contractors in the second week.
![]() |
| The Vaults & Garden Cafe |
![]() |
| The Old Library |
![]() |
| The Shop |
![]() |
| The Vestry |
Week 2 – No going back
The wait is finally over as the contractors move in and begin to erect the protective screens between the De Brome Chapel, the Chancel and the Nave.
Coming up in week 3......The tower and spire disappear beneath the scaffolding!
Photographs 1-5 (c) David Goodwin
Photograph 6 (c) Richard Taylor
Lucinda Williams, Heritage Education & Volunteers Officer
January 2012 - Project Update
After the New Year we came back to a flurry of activity in readiness for handing over the north-east corner of the church to the building contractor. The vestry/sacristy has been moved to a new temporary location in the former Vaults Café office. The shop has been temporarily moved to the north-west corner of the church near the font. There has been a lot of clearing and sorting of various parts of the church. We are working closely with the contractor to develop the protection for the organ in such a way that it can be played during the next phase of the work, although there will inevitably be some muffling of the sound.
From the 11th of January the shop, De Brome Chapel, chancel, café, library and tower will be in the possession of our contractor EJ Beard. The next few months will undoubtedly be some of the most challenging for all concerned however I hope to update you on the progress of the work whenever I can. Working with our Education Officer Luci, we aim to give you more information on some of the processes and rationale for various aspects of the work in due course.
From the 11th of January the shop, De Brome Chapel, chancel, café, library and tower will be in the possession of our contractor EJ Beard. The next few months will undoubtedly be some of the most challenging for all concerned however I hope to update you on the progress of the work whenever I can. Working with our Education Officer Luci, we aim to give you more information on some of the processes and rationale for various aspects of the work in due course.
Sophie Slade, Project Coordinator
Tuesday, 10 January 2012
Easy Does It!
Back in December we were able to capture some extraordinary footage of 21st century scaffolding being lifted carefully into place without damaging any of the church's delicate 14th century features. It is worth sparing a thought at this time for the workmen and tradesmen who were responsible for building this magnificent church over 700 years ago – without cranes or hard hats!
With thanks to Natalie Nolan for her persistance in recording this footage.
Lucinda Williams, Heritage Education & Volunteers Officer
Wednesday, 21 December 2011
Christmas heralds a new beginning for St Mary's
As the clergy prepare for one of the busiest weeks in the church calendar, the project team are putting the final preparations in place to ensure that the works can begin unhindered in the New Year. After many months of planning, fundraising and development meetings the project will finally get underway in the North East corner of the church on 9th January. Some of the first changes that visitors will notice will include:
· The Vaults and Gardens Café will be closed from 3rd January so that both the café and the old library above it can be refurbished.
· Partitions will be erected beneath the organ and between the nave and the Adam de Brome chapel to allow for conservation works to be carried out (the nave will remain accessible via the high street entrance until the summer)
· The scaffolding will continue to grow up the tower and spire in preparation for stonework repairs and cleaning
Over the past few weeks the scaffolding has been advancing at a steady pace and, as I write this entry, it has now reached the viewing platform at the base of the spire. The photographs below were taken by a member of our new volunteer photographer team on the day when some of the key loading beams were carefully lifted into place.
All photographs courtesy of Natalie Nolan, Volunteer Photographer
Lucinda Williams, Heritage Education & Volunteers Officer
· The Vaults and Gardens Café will be closed from 3rd January so that both the café and the old library above it can be refurbished.
· Partitions will be erected beneath the organ and between the nave and the Adam de Brome chapel to allow for conservation works to be carried out (the nave will remain accessible via the high street entrance until the summer)
· The scaffolding will continue to grow up the tower and spire in preparation for stonework repairs and cleaning
Over the past few weeks the scaffolding has been advancing at a steady pace and, as I write this entry, it has now reached the viewing platform at the base of the spire. The photographs below were taken by a member of our new volunteer photographer team on the day when some of the key loading beams were carefully lifted into place.
All photographs courtesy of Natalie Nolan, Volunteer Photographer
I would like to take this opportunity on behalf of all of the staff, clergy and project team at St Mary’s to wish all of our readers and visitors a Merry Christmas and we look forward to you joining us in the New Year to share more of our exciting project developments.
Lucinda Williams, Heritage Education & Volunteers Officer
Monday, 5 December 2011
December 2011 - Project Update
As the scaffold grows taller, progress continues behind the scenes to prepare for the commencement of the works in January and the team have turned their attention to communications. On Sunday the 27th of November there was a drop-in session in the Old Library for parishioners and visitors alike. Members of the project team were on hand to answer questions about the project and plans were available to view. On Sunday 11th December the church's Education Officer Lucinda Williams will be in conversation with Canon Brian Mountford during the morning Eucharist discussing details of the new education and volunteers programme and how we plan to bring the stories of St Mary's to life.
On Thursday the 17th of November the development project was featured in the Oxford Times and we hope that the Times will run several follow-up features on various aspects of the project. To view this article, click HERE.
More details will follow in future newsletters on a community project to decorate the hoarding around the church and we anticipate that the scaffold will be have printed images focusing on the heritage of St Mary’s on several sides of the tower.
| Photograph by Natalie Nolan |
On Thursday the 17th of November the development project was featured in the Oxford Times and we hope that the Times will run several follow-up features on various aspects of the project. To view this article, click HERE.
More details will follow in future newsletters on a community project to decorate the hoarding around the church and we anticipate that the scaffold will be have printed images focusing on the heritage of St Mary’s on several sides of the tower.
Sophie Slade, Project Coordinator
Wednesday, 30 November 2011
Project Leaders Speak Out
In the second instalment of our staff interviews, we spoke to two fundamental members of the project team, Sophie Slade and Nigel Aplin, who are responsible for managing and delivering the major project outcomes and making sure that everything runs as smoothly as possible.
Sophie Slade, Project Coordinator
"Taking up the role of Project Coordinator has been a fascinating and enjoyable experience. I feel very honoured to be tasked with overseeing such a complex and important project. St Mary's is one of the most interesting historic buildings I have known and the various communities and visitors who benefit from it help to bring it to life. I am most looking forward to seeing the freshly conserved and repaired building emerge. It will also be a joy to see improved facilities for the staff and visitors."
Nigel Aplin, Project Manager
"As project manager for the building works, I am delighted to see the scaffolding being erected around the tower and spire, ahead of the main construction works commencing in the New Year. This is the culmination of nearly four years leading the Church and designers through the project process, working through several steps to get us to this position:
1. Feasibility stage: taking the initial ideas and identifying the scope and budget cost of the works; formulating a plan and programme to undertake the works; and identifying ways of funding the project.
2. Concept Design stages: successfully bidding for Heritage Lottery Fund development money to develop the building design ideas; develop our thoughts on the how the Church can tell its story and involve the community.
3. Enabling building works: provide an office base (and new toilets!) for the Church to occupy during the main building works.
4. Design Completion: successfully bidding for the major Heritage Lottery Fund implementation grant, having raised over £1million to allow us to bid. This allowed us to complete our design work and detail how the education and interpretation programmes will work. We have followed this by tendering the building works over the past months.
For me, one of our greatest challenges has been in programming the works whilst keeping parts of this iconic building safely open. The Church wished to remain at least partially open for worship and ministry during the works, so either the Nave or Chancel will be kept open. This has required early remodelling of the Narthex office, providing a new kitchenette and toilets, which can be independently used throughout the building works. Additionally, the tower and café are major attractions, particularly busy during the summer months, providing income and local employment, so these are programmed to be closed during the quieter winter months, which provide a technical challenge for accessing and repairing the stonework. We are now working with Beard, our building contractor, to minimise disruption and ensure smooth running during the works.
Whilst four years seems a long time, we are still on target to complete the main building works in late 2012, as originally planned. This reflects the dedication and enthusiasm of the Church and its designers to meet the target dates set out at the start of this journey. "
Sophie Slade, Project Coordinator
"Taking up the role of Project Coordinator has been a fascinating and enjoyable experience. I feel very honoured to be tasked with overseeing such a complex and important project. St Mary's is one of the most interesting historic buildings I have known and the various communities and visitors who benefit from it help to bring it to life. I am most looking forward to seeing the freshly conserved and repaired building emerge. It will also be a joy to see improved facilities for the staff and visitors."
Nigel Aplin, Project Manager
"As project manager for the building works, I am delighted to see the scaffolding being erected around the tower and spire, ahead of the main construction works commencing in the New Year. This is the culmination of nearly four years leading the Church and designers through the project process, working through several steps to get us to this position:
1. Feasibility stage: taking the initial ideas and identifying the scope and budget cost of the works; formulating a plan and programme to undertake the works; and identifying ways of funding the project.
2. Concept Design stages: successfully bidding for Heritage Lottery Fund development money to develop the building design ideas; develop our thoughts on the how the Church can tell its story and involve the community.
3. Enabling building works: provide an office base (and new toilets!) for the Church to occupy during the main building works.
4. Design Completion: successfully bidding for the major Heritage Lottery Fund implementation grant, having raised over £1million to allow us to bid. This allowed us to complete our design work and detail how the education and interpretation programmes will work. We have followed this by tendering the building works over the past months.
For me, one of our greatest challenges has been in programming the works whilst keeping parts of this iconic building safely open. The Church wished to remain at least partially open for worship and ministry during the works, so either the Nave or Chancel will be kept open. This has required early remodelling of the Narthex office, providing a new kitchenette and toilets, which can be independently used throughout the building works. Additionally, the tower and café are major attractions, particularly busy during the summer months, providing income and local employment, so these are programmed to be closed during the quieter winter months, which provide a technical challenge for accessing and repairing the stonework. We are now working with Beard, our building contractor, to minimise disruption and ensure smooth running during the works.
Whilst four years seems a long time, we are still on target to complete the main building works in late 2012, as originally planned. This reflects the dedication and enthusiasm of the Church and its designers to meet the target dates set out at the start of this journey. "
Education & Volunteering - What's New?
In the three months since my appointment I have been consistently overwhelmed by the exciting and inspiring opportunities that St Mary’s has to offer, particularly as a learning resource. For a building with such a tremendously diverse history I have been surprised to find that there are still a number of features and stories which remain untold. The relationship between the education and interpretation teams on this project is crucial in ensuring that these stories are brought to life in a way that is both interesting to visitors and one which inspires members of the existing congregation to see their church in new and exciting ways.
A crucial element in building the new education programme will involve working closely with partner organisations and local schools to give them the opportunity to tell us what they would like to see and take part in when the restoration is complete. University Church is a wonderfully rich learning environment and we hope that through our consultations with a variety of different groups we will be able to encourage audiences of all ages to participate in this exciting once in a lifetime project.
Helping us to tell these stories will be a team of volunteer welcomers and guides who will look after our new Welcome Desk and deliver tours to groups of visitors. Visitors to St Mary’s come for many different reasons and the welcome desk will become a place where they can find out more about the church, collect trails and leaflets and enquire about upcoming events. To find out more about joining our new volunteer team, click HERE to contact us. The deadline for these applications is January 20th 2012.
As a result of our recent volunteer photographer recruitment campaign, I am delighted to welcome Natalie to the church to head up our photography team. Natalie is an architecture student with a particularly unusual enthusiasm for scaffolding which explains her attraction to the position! I have been delighted by the positive response to this campaign and look forward to working with Natalie and the other members of the team as they capture the restoration in all of its glory over the coming months.
A crucial element in building the new education programme will involve working closely with partner organisations and local schools to give them the opportunity to tell us what they would like to see and take part in when the restoration is complete. University Church is a wonderfully rich learning environment and we hope that through our consultations with a variety of different groups we will be able to encourage audiences of all ages to participate in this exciting once in a lifetime project.
Helping us to tell these stories will be a team of volunteer welcomers and guides who will look after our new Welcome Desk and deliver tours to groups of visitors. Visitors to St Mary’s come for many different reasons and the welcome desk will become a place where they can find out more about the church, collect trails and leaflets and enquire about upcoming events. To find out more about joining our new volunteer team, click HERE to contact us. The deadline for these applications is January 20th 2012.
As a result of our recent volunteer photographer recruitment campaign, I am delighted to welcome Natalie to the church to head up our photography team. Natalie is an architecture student with a particularly unusual enthusiasm for scaffolding which explains her attraction to the position! I have been delighted by the positive response to this campaign and look forward to working with Natalie and the other members of the team as they capture the restoration in all of its glory over the coming months.
Lucinda Williams, Heritage Education & Volunteers Officer
Tuesday, 8 November 2011
November 2011 - Project Update 2
Since the last update, the main contractor for the project has been appointed. Beard Oxford will be responsible for delivering the repairs, renovations and conservation work that forms the ‘renewal’ part of the project. There has been some delay in getting practical dates and information to those concerned due to the complicated nature of the scaffolding design. Discussions about the design for the scaffold have been ongoing since September and it was essential to finalise this design before the work could begin. Since then the pace has picked up considerably. Between now and the end of the year the contractor will be erecting the scaffold around the tower and the exterior of the nave. Access to the shop and church from the Radcliffe Square entrance will be limited while the scaffold is being erected and it is likely that access through this door will only be possible at weekends. A safe tunnel will be built shortly to maintain access to both of the Vaults entrances.
January 2012 will see the start of Phase 2 of the project. This phase will be the most challenging for clergy, staff, parishioners and visitors as the entire north-east corner will be out of bounds and we will only have the nave and narthex offices. Full details are available from the church office.
For more information about the project and to speak to members of the project team about their plans, come along to our Open Day on Sunday 27th November at 12pm. This drop-in session is an opportunity for you to ask any questions and to view some of the architectural plans.
January 2012 will see the start of Phase 2 of the project. This phase will be the most challenging for clergy, staff, parishioners and visitors as the entire north-east corner will be out of bounds and we will only have the nave and narthex offices. Full details are available from the church office.
For more information about the project and to speak to members of the project team about their plans, come along to our Open Day on Sunday 27th November at 12pm. This drop-in session is an opportunity for you to ask any questions and to view some of the architectural plans.
Sophie Slade, Project Coordinator
Friday, 4 November 2011
November 2011 - Project Update
Preparations for the erection of the contractor's site compound and scaffolding to the tower is picking up place and from the 7th of November work will centre on completing the compound, providing office, toilet and catering facilities for the contractor. Work to erect the tower scaffold will centre on building an access scaffold to allow the contractor to get nearer to the areas of the tower where they will be putting in supports for the main scaffold. The shop and tower will only be accessible from the High Street entrance.
Sophie Slade, Project Coordinator
Monday, 17 October 2011
St Mary's staff share their thoughts
Over the coming months we will be interviewing members of staff, new and old, to find out what they think of the plans for the redevelopment. This month we've been catching up with some of the clergy and staff who were working in the church when the funding was awarded:
Canon Brian Mountford, vicar of St Mary's:
“I am delighted that the Heritage Lottery Fund has decided to make this significant award to the University Church of St Mary the Virgin. It comes after long and careful consultation with local people, national bodies, and professional advisers as to what is best for this iconic Oxford building. In the process we have been helped to think about widening our educational outreach as well as the conservation of the fabric.
Everyone at St Mary’s is looking forward to being part of this challenging development and to the involvement of the local community in the process. As the work goes ahead both the church and theVaults and Gardens Cafe will be faced with considerable temporary restrictions, but the end-product will be a transformation to see St Mary’s through the next fifty years. I would also like to thank once again the Clore Duffield Foundation, the University of Oxford, several trusts and many individuals for donations already made.”
Ruth Rundle, Parish Administrator:
"Working at St Mary’s is an enormous privilege at the best of times but I feel incredibly lucky to be working here at such an exciting time in the Church’s history. I’m looking forward to seeing the transformation occur as the work progresses and even more, seeing the finished product!"
Will Pouget, founding director of the Vaults and Garden Café:
"We are very excited about these dramatic improvements to the building particularly those allowing us to host many more events (both private and community based) with much improved facilities allowing more ambitious menus and a greater hospitality service. We are proud also that our vision of using seasonal locally sourced organic& ethical produce has been so supported by the church and that being a part of these improvements will enable us to bring such produce to a wider audience.”
Canon Brian Mountford, vicar of St Mary's:“I am delighted that the Heritage Lottery Fund has decided to make this significant award to the University Church of St Mary the Virgin. It comes after long and careful consultation with local people, national bodies, and professional advisers as to what is best for this iconic Oxford building. In the process we have been helped to think about widening our educational outreach as well as the conservation of the fabric.
Everyone at St Mary’s is looking forward to being part of this challenging development and to the involvement of the local community in the process. As the work goes ahead both the church and theVaults and Gardens Cafe will be faced with considerable temporary restrictions, but the end-product will be a transformation to see St Mary’s through the next fifty years. I would also like to thank once again the Clore Duffield Foundation, the University of Oxford, several trusts and many individuals for donations already made.”
Ruth Rundle, Parish Administrator:"Working at St Mary’s is an enormous privilege at the best of times but I feel incredibly lucky to be working here at such an exciting time in the Church’s history. I’m looking forward to seeing the transformation occur as the work progresses and even more, seeing the finished product!"
"We are very excited about these dramatic improvements to the building particularly those allowing us to host many more events (both private and community based) with much improved facilities allowing more ambitious menus and a greater hospitality service. We are proud also that our vision of using seasonal locally sourced organic& ethical produce has been so supported by the church and that being a part of these improvements will enable us to bring such produce to a wider audience.”
Lucinda Williams, Heritage Education & Volunteers Officer
Tuesday, 4 October 2011
Meet the Team
In the last month the project team have been busy preparing for the appointment of our main contractor, which will be announced shortly. Once we have the contractor on board we will be able to create a more detailed programme for the works and firm up logistical details for the staff at the church so they can make necessary preparations.
To help with the delivery and management of this exciting project, we have already recruited a number of new team members:
To help with the delivery and management of this exciting project, we have already recruited a number of new team members:
Lucinda Williams, Heritage Education & Volunteers Officer
Oliver Caroe, Architect
With a professional project team now in place, November will see the start of Phase one of four phases of building work which are due for completion in December 2012. During this time, the improvements being undertaken will include:
· Extensive repairs to the exterior stonework, including redressing the stone on the iconic 13th-century tower for the first time in a century.
· Cleaning, conservation and restoration of the interior decorations, including windows, memorials, and choir stalls.
· Improved access and facilities for the Old Library, a room that has largely been hidden from view for centuries (funded by the Clore Duffield Foundation).
· Establish St Mary’s as an information and learning centre providing an overview and introduction to the history of the University and of the church building itself.
Lucinda Williams, Heritage Education & Volunteers Officer
Tuesday, 20 September 2011
September 2011 - Project Update
In the last month the project team have been busy preparing for the appointment of our main contractor, which will be announced shortly. Once we have the contractor on board we will be able to create a more detailed programme for the works and firm up logistical details for the staff at the church so they can make necessary preparations.
Meanwhile, Lucinda has been settling in and getting to know her colleagues and useful contacts. Lucinda has started to work with Pegasus School on a series of visits by the pupils to look at different aspects of the church. The Heritage Lottery Fund are very keen on maintaining an element of participation for visitors and school children to learn about the conservation of the church. Lucinda and I are looking at a range of different ways to achieve this.
Meanwhile, Lucinda has been settling in and getting to know her colleagues and useful contacts. Lucinda has started to work with Pegasus School on a series of visits by the pupils to look at different aspects of the church. The Heritage Lottery Fund are very keen on maintaining an element of participation for visitors and school children to learn about the conservation of the church. Lucinda and I are looking at a range of different ways to achieve this.
Sophie Slade, Project Coordinator
Saturday, 17 September 2011
St Mary's embarks on exciting new restoration project
In January 2010, University Church was awarded a £3.4 million grant from the Heritage Lottery Fund for the conservation and refurbishment of the church building, and the development of new learning and interpretation resources.
As the work gets underway, visitors to the church will notice that access to certain areas is restricted whilst improvements are made. Fear not! This blog will provide you with a photographic record of the works which are being carried out behind-the scenes, together with photos of events and activities, and insights from members of the team.
St. Mary’s has been a site of Christian worship and the focus of lively religious, political and moral debates for over seven hundred years. The church was once a meeting place for the university governing body (The Congregation) and the Chancellor’s Court, as well as being home to the first Oxford University Library. The building has also played host to a number of key historical events from the trial of Cranmer in the 16th century, to the birth of the Oxford Movement and the founding of Oxfam, to name but a few.
Despite periods of intermittent remedial work, no comprehensive restoration has been undertaken since the late nineteenth century, and the interior has remained unaltered for several generations. The gradual increase in use over the centuries has placed considerable strain on the building and its facilities which means that the majority of the building’s fabric is now beyond mere maintenance.
After long and careful consultation with the local community, national bodies, and professional advisers and a rigorous application process, University Church was awarded a £3.4 million grant from the Heritage Lottery Fund for the conservation and refurbishment of the church building and Old Congregation House, and the development of new learning, interpretation and volunteering programmes.
Throughout this period we will be creating a number of new opportunities for members of the community, including groups and schools, to become involved with the project. If you would like to find out more about how you can be a part of this exciting new development, please contact us.
Lucinda Williams, Heritage Education & Volunteers Officer
As the work gets underway, visitors to the church will notice that access to certain areas is restricted whilst improvements are made. Fear not! This blog will provide you with a photographic record of the works which are being carried out behind-the scenes, together with photos of events and activities, and insights from members of the team.
St. Mary’s has been a site of Christian worship and the focus of lively religious, political and moral debates for over seven hundred years. The church was once a meeting place for the university governing body (The Congregation) and the Chancellor’s Court, as well as being home to the first Oxford University Library. The building has also played host to a number of key historical events from the trial of Cranmer in the 16th century, to the birth of the Oxford Movement and the founding of Oxfam, to name but a few.
Despite periods of intermittent remedial work, no comprehensive restoration has been undertaken since the late nineteenth century, and the interior has remained unaltered for several generations. The gradual increase in use over the centuries has placed considerable strain on the building and its facilities which means that the majority of the building’s fabric is now beyond mere maintenance.
After long and careful consultation with the local community, national bodies, and professional advisers and a rigorous application process, University Church was awarded a £3.4 million grant from the Heritage Lottery Fund for the conservation and refurbishment of the church building and Old Congregation House, and the development of new learning, interpretation and volunteering programmes.
Throughout this period we will be creating a number of new opportunities for members of the community, including groups and schools, to become involved with the project. If you would like to find out more about how you can be a part of this exciting new development, please contact us.
Lucinda Williams, Heritage Education & Volunteers Officer
Tuesday, 16 August 2011
August 2011 - Project Update
During August the St Mary’s Project Team have been busy with audio visual and lighting trials. Many of us have also taken the opportunity to have a much needed break before we become fully immersed in preparations for the building works to begin. The tender process for our main contractor is also well under way. Our scaffold design has changed considerably and the new design removes the need for supporting props in the interior of the church.
At the end of July, Lucinda Williams was appointed as our Heritage Education and Volunteers Officer. Lucinda will take up her post on the 12th of September. We are pleased to be welcoming Lucinda to St Mary’s as she has a great track record of developing educational programmes and working with volunteers and community partnerships. Previously, Lucinda has worked at the John Moore Museum in Tewkesbury and at Oriel y Parc in Pembrokeshire.
At the end of July, Lucinda Williams was appointed as our Heritage Education and Volunteers Officer. Lucinda will take up her post on the 12th of September. We are pleased to be welcoming Lucinda to St Mary’s as she has a great track record of developing educational programmes and working with volunteers and community partnerships. Previously, Lucinda has worked at the John Moore Museum in Tewkesbury and at Oriel y Parc in Pembrokeshire.
Sophie Slade, Project Coordinator
Wednesday, 6 July 2011
July 2011 - Project Update
The last month has been a very busy time for the development project. The design team, led by the architects, now comprises over 25 consultants and they are working feverishly to develop the design specification for the various works and submit planning applications.
Joining the team recently, Tim Gardom Associates will design the visitor information, to be installed in St Marys. This display material, also known as ‘interpretation’, is made up of a range of elements throughout the Church with the focus on the De Brome Chapel. Joining them is Sutton Vane Associates headed by Mark Sutton Vane, who will design a lighting plan for St Mary’s.
The project team are also in the process of recruiting a Heritage Education and Volunteers Officer who will take up their post in September. The Education Officer will work closely with the Associate Priests and the Project Coordinator to develop an education, outreach and volunteer programme. The interpretation consultants will also liaise closely with the new Officer to ensure that the installation around the Church relates to the heritage education and volunteer work they are developing.
Joining the team recently, Tim Gardom Associates will design the visitor information, to be installed in St Marys. This display material, also known as ‘interpretation’, is made up of a range of elements throughout the Church with the focus on the De Brome Chapel. Joining them is Sutton Vane Associates headed by Mark Sutton Vane, who will design a lighting plan for St Mary’s.
The project team are also in the process of recruiting a Heritage Education and Volunteers Officer who will take up their post in September. The Education Officer will work closely with the Associate Priests and the Project Coordinator to develop an education, outreach and volunteer programme. The interpretation consultants will also liaise closely with the new Officer to ensure that the installation around the Church relates to the heritage education and volunteer work they are developing.
Sophie Slade, Project Coordinator